Storehouses and buildings

System halls

All-in-one-solution up and running in 6-8 weeks.

Product detail

Family houses

All-in contract houses can be built within 3 months. The construction is not dependent on weather. Due to a small amount of used materials, small space for storage is needed.

Product detail

Light masonry buildings

Light masonry buildings are characterized by speed of construction, high layout variability and low price.

Product detail

Prefab buildings

Prefab buildings meet even the most demanding building construction criteria. The skeleton of a prefab building is composed of a steel frame with a span of up to 7.2 meters.

Product detail

Steel buildings

Buildings with a steel frame are intended for construction in the area of industrial production, storage, business and agriculture.

Product detail